Re: [MW:27487] Exchanger hydro test

Corrected as use of manifold in hydro test.

On Mar 9, 2018 6:39 PM, vijay.patre09@gmail.com wrote:

Could u pls explain the purpose of hydrotest.
Some of the manufacturers are using SRV to release excess pressure which occurs mainly when holding time increases and temp goes up.

Regards,
Vijay Patre

On Mar 9, 2018 10:38 AM, "PK M" <pkmqaqc@gmail.com> wrote:

Dear Experts,

Yesterday our client reject to exchanger hydro test.

Normally we use two gauge. Actually one gauge for equipment vent high point. One gauge for equipment connected manifold itself low point.

But client requirement equipment Drain itself.

That the reason he rejected hydro.

Can anybody explain gauge for equipment connected manifold itself it is accepteble or not?

Any code reference / clear Detail .

 

Thank you.

KM.


--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...