Re: [MW:27484] UT in lieu of RT

Hi

These are Client requirements, unless your TQ is approved you can't carry out UT in lieu of RT.

Regards
P Govindan

On Mar 7, 2018 05:51, "pradip kumar Sil" <pradipsil@gmail.com> wrote:
Dear Everybody,
Can we perform  UT on the pipe joints as per ASME Sec 1 or B31.1 instead of RT.
Pls clarify with code references.
Thanks in advance
Regards
Pradip

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...