To accept any hydro test its necessary to disconnect any source of energy.
It's necessary to disconnect the manifold.
Hernán Castillo Mier
Profesional Especialista de Equipo Estático
FACILITADOR AUTORIDAD TÉCNICA EQUIPO ESTÁTICO
INSPECTOR AUTORIZADO
API 510 (33119)
Avantel: 8*1571
Teléfono: 668-2396
De: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] En nombre de PK M
Enviado el: viernes, 9 de marzo de 2018 12:01 AM
Para: materials-welding@googlegroups.com
Asunto: [MW:27479] Exchanger hydro test
Dear Experts,
Yesterday our client reject to exchanger hydro test.
Normally we use two gauge. Actually one gauge for equipment vent high point. One gauge for equipment connected manifold itself low point.
But client requirement equipment Drain itself.
That the reason he rejected hydro.
Can anybody explain gauge for equipment connected manifold itself it is accepteble or not?
Any code reference / clear Detail .
Thank you.
KM.
--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment