[MW:27488] Re: Exchanger hydro test

Dear,

Client is right in this case.
As per ASME Sec. VIII Div. 1 , UG 102 Test Gages to be place directly to vessel.

Regards,
Ankit Gandhi

On Friday, 9 March 2018 10:38:37 UTC+5:30, PK wrote:

Dear Experts,

Yesterday our client reject to exchanger hydro test.

Normally we use two gauge. Actually one gauge for equipment vent high point. One gauge for equipment connected manifold itself low point.

But client requirement equipment Drain itself.

That the reason he rejected hydro.

Can anybody explain gauge for equipment connected manifold itself it is accepteble or not?

Any code reference / clear Detail .

 

Thank you.

KM.


--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...