[MW:27557] Re: PWHT required or not for Saddle welded to pipes

Yes. PWHT required as it is directly welded to pressure part.

On Thursday, December 21, 2017 at 9:14:19 AM UTC+3, bapun wrote:
Dear Expert 
                    Kindly help me out to decide whether we have to perform PWHT or not for Pipe to Saddle support fillet welding .Design  Code ASME B 31.1 .The details given below and its a long distance pipe rack job

The saddle material is ASTM A387 GR 11.
The welding type is fillet welding.
HP pipe detail - DN-350,THK-28 mm and Material  ASTM A 335 P11.

--
tHanks & rEgards
Chandra Bhanu Mohapatra

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

Re: [MW:35501] TEST COUPON ASME SEC IX

Yes, You can machine the Plate.  Prepare the Welding Running Sheet and mention 14 mm Plate machined to 8 mm Plate.  then the groove weld qua...