Yes. PWHT required as it is directly welded to pressure part.
On Thursday, December 21, 2017 at 9:14:19 AM UTC+3, bapun wrote:
-- On Thursday, December 21, 2017 at 9:14:19 AM UTC+3, bapun wrote:
Dear ExpertKindly help me out to decide whether we have to perform PWHT or not for Pipe to Saddle support fillet welding .Design Code ASME B 31.1 .The details given below and its a long distance pipe rack jobThe saddle material is ASTM A387 GR 11.The welding type is fillet welding.HP pipe detail - DN-350,THK-28 mm and Material ASTM A 335 P11.--tHanks & rEgardsChandra Bhanu Mohapatra
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment