[MW:5202] RE: 5200] NDT after PWHT

-------------------------------------

Interpretation:  I‑89‑14

Subject:         Section I (1986 Edition, 1987 Addenda), PW‑11,

                 NDE Prior to PWHT

Date Issued:     December 15, 1988

File:            BC88‑393

  Question: Does PW‑11 require that NDE be performed on welds after they have been subjected to the postweld heat treatment required by PW‑39?

  Reply: No, unless the conditions described in PW‑11.2.2 exist.

----------------------------------------------

Interpretation:  VIII-1-98-09

Subject:         Section VIII, Division 1 (1995 Edition, 1996 Addenda); NDE

                 Requirements for PWHT Vessels

Date Issued:     December 5, 1997

File:            BC97-263

  Question: For a vessel in which postweld heat treatment is a requirement, is it mandatory that all radiographic examination required by UW-11 of Section VIII, Division 1 be performed after the final postweld heat treatment?

  Reply: No.

 Note: This Interpretation has been superceded by the following “R” (Revised) Interpretation:

*

Interpretation:  VIII-1-98-09R

Subject:         Section VIII, Division 1; UW-11 and UCS-57

Date Issued:     February 27, 2003

File:            BC03-268*

  Question: For a vessel in which postweld heat treatment is a requirement, is it mandatory that all radiographic examination required by UW-11 of Section VIII, Division 1 be performed after the postweld heat treatment?

  Reply: No, except that UHA-33(b) and UHA-33(c) require radiographic examination after PWHT.

-------------------------------------------

Rgds

Raj

 

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of pgoswami@sympatico.ca
Sent: Friday, May 21, 2010 00:29
To: materials-welding@googlegroups.com
Subject: [MW:5200] NDT after PWHT

 

Luis,
 
According to ASME Sec VIII,DIV-1,welds have to be radiographed,as a part of the design efficiency, e.g RT-1,RT-2.... and others. No code will specify at what point of fabrication NDE (such as RT) has to be done, if so that becomes too binding. Often clients spefication, which is more suited to service conditions, specify if RT shall be done before or after PWHT.
 
Usually from codes perspectives for steels which are not prone to serious cracking (e.g P1,P3,P4,P5A) RT shall be done on completion of fabrication, prior to PWHT. For steels which may develop cracking upon PWHT, through secondary hardening, such as P5B, P5C additional NDE (RT/UT or others) should be done following PWHT, to safeguard the components.    
 
From ASME perspectives, for PI materials RT shall be done prior to PWHT. If  there is any additional project requirement of RT after PWHT it is above the code requirements.
 
Thanks.
 
Pradip Goswami,P.Eng
Welding & Metallurgical Engineer/Specialist
 


Date: Thu, 20 May 2010 06:30:55 -0700
From: ing_albanes@yahoo.com.mx
Subject: [MW:5198] NDT after PWHT
To: materials-welding@googlegroups.com

Dear friends

We just finished PWHT in an LPG sphere acording to ASME VIII section I, and I can´t find in the code the part that obligues to Xray after this treatment, any one has experience with this? where does ASME VIII say it has to be done?

Thank you

Luis Albanés


 
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...