Tuesday, July 24, 2018

Re: [MW:28131] NCR for leak found in water filling

Dear
Of course it is not acceptable and as such the client has right to raise NCR.
Now you can close the NCR as per your Management system procedure.
Thanks

On Tue, Jul 24, 2018, 5:17 PM SRINI <kanna.qc@gmail.com> wrote:
Dear All

My client raised NCR for founding leakage during water fill on GRE pipe at run pipe. Leak found During time of water filling and  before starting hydro test.

Could any body please explain me raised NCR is acceptable or not.

AS per ITP- 6.3 is water filling stage
                    6.4 is hydro test.

Please reply me in urgent basis.


Regards
Srinivasan.A

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...