Dear Gentlemen,
We are doing welding of LTCS materials, while welding some of the
joints we welded final run in single bead which is as per approved
WPS(3 x electrode dia.) Our client is asking us to do multi bead
welding above 6" pipe even though the gap in groove is below 9 mm. We
are using 3.15 electrode to do the final run. We are maintaining heat
in put in control. Please clarify me whether it is correct or not?
Thanks & Regards
N.Kiran kumar,
--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
We are doing welding of LTCS materials, while welding some of the
joints we welded final run in single bead which is as per approved
WPS(3 x electrode dia.) Our client is asking us to do multi bead
welding above 6" pipe even though the gap in groove is below 9 mm. We
are using 3.15 electrode to do the final run. We are maintaining heat
in put in control. Please clarify me whether it is correct or not?
Thanks & Regards
N.Kiran kumar,
--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
Comments