Dear Members,
we are going to qualify MIG welding process.
How to differentiate metal transfer like dip, globular & spray?
we are using IS 2062 material with 99.9% CO2 shielding gas,1.2 dia filler wire,12mm thick in single '' V'' Grove butt Joint.
what is the desired testing requirements ? depending of metal transfer as per section IX
what is the desired testing requirements ? depending of metal transfer as per section IX
thanks and regards,
Suresh