Hi Jose,
 
Strictly as per all design and construction codes as well as the  various recommended practices, "PWHT" on grade 91 steel is must after welding.
 
Off late there had been thoughts to push " Temper bead repair technique in NBIC " by EPRI (Electric Power Research Institute).You may search in google under" temper bead welding on grade-91 steel or other suitable titles" to get more details.
 
In order to achieve those one has to have "PQR " qualified separately as well as the welding  consumables may be different.Which may need some lead time and preparations.
 
I would think the trouble free option without any prior preparations would be to PWHT the welds.
 
Please see the link below, whether I' ad posted the link to NBIC document containing an EPRI presentation.
 
Thanks,
 
 
Pradip Goswami, P.Eng,IWE
Welding & Metallurgical Engineer/Specialist
Ontario, Canada
 
 
https://www.linkedin.com/grp/post/122787-198284274

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of José Luís Ferreira
Sent: Friday, May 08, 2015 10:15 AM
To: materials-welding@googlegroups.com
Subject: [MW:23237] Welding P91 without PWHT

Is there an alternative to weld P91 to P91 (Cr-Mo-V) without performing PWHT? I need to weld (repair) small valves (socket welds) in field.

--
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/70192939-7f6a-40f3-be22-dec8ccbc00ad%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .