Re: Re: [MW:5238] NDT after PWHT

Dear Luis

As per my knowledge there is no specific standard saying
this, usally it is demanded by Company specification.

So you can check in your CPY reference doc, If not found
do not hesitate to ask your cpy to mention it in the reference
doc.

Also It's company's responsibility to decide whether NDT
should be done after PWHT or not ?

Regards
Manpreet Singh
On Mon, 24 May 2010 20:38:37 +0530 wrote
>Dear Mampreet
My concerns are 2, 1: If I have to do it though my material is ferritic, ASTM A516 grade 70. 2: If I can force the contractor based on the code ??
Thanks a lot
Luis
>
>--- El vie 21-may-10, manpreet escribió:
>

>De: manpreet
>Asunto: Re: [MW:5212] NDT after PWHT
>A: materials-welding@googlegroups.com
>Fecha: viernes, 21 de mayo de 2010, 6:17
>
>

>Dear Luis
>
>Currently I am working on LPG Pipeline project.
>
>We have All P1 material, Even then Cpy spec ask for
>NDT after PWHT.
>
>When in doubt always go for stringent reference.
>Acc to me it's better to go for NDT after PWHT.
>
>Regards
>Manpreet Singh
>Spiecapag
>Welding Engineer
>On Thu, 20 May 2010 22:05:58 +0530 wrote
>>
>Dear friends
>We just finished PWHT in an LPG sphere acording to ASME VIII section I, and I can´t find in the code the part that obligues to Xray after this treatment, any one has experience with this? where does ASME VIII say it has to be done?
>Thank you
>Luis Albanés
>
>
>
>
>
>
>
>
>--
>>
>To post to this group, send email to materials-welding@googlegroups.com
>>
>To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
>>
>For more options, visit this group's bolg at
http://materials-welding.blogspot.com/
>>
>The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>>
>
>




--
>To post to this group, send email to materials-welding@googlegroups.com
>To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
>For more options, visit this group's bolg at http://materials-welding.blogspot.com/
>The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>








--
>
To post to this group, send email to materials-welding@googlegroups.com
>
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
>
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
>
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .