Re: [MW:5309] DP test Requirement in Overlay PQR.

Dear Mr. Rao

As per ASME sec viii div 1,No 42 , VIII-1-98-09,NDT can be performed
before PWHT as well.

in my opinion, Doing a DP test is not a big deal,if client asking for
it,you should fulfill his requirements.

Regards
Manpreet Singh
Welding Engineer
Spiecapag
On Sun, 30 May 2010 12:34:57 +0530 wrote
>
>

>
Dear All,
>

>
I have conducted Overlay PQR qulification (316L OVERLAY ON SA516 Gr.70N) as per ASME Sec IX.
>

>
As per ASME SEC IX QW-453, note 4, 5, 9, we have conducted
>

>
1. DP test after every layer(total 3layers) in as-welded condition.
>
2. 4-Side bend tests in PWHT condition.
>
3. Chemical analysis from overlay specimen in as-welded condition.
>

>
Job requirement:
>
316L weld overlay on SA516 Gr.70, vessel will under PWHT at 620 Deg.C.
>
ASME Div.1 Cladded Vessel.
>

>
Client Comments on PQR.
>

>
client is demanding us to provide DP report After PWHT of the overlay.
>

>
Client says PWHT is essential variable, DP test & bend tests should be conducted after PWHT.
>

>
Query.
>

>
Is it Code (Sec.IX or Div.1 ) requirement to conduct DP test after PWHT ?.
>

>
If it is code requirement, pl. provide the reference from code.
>

>
if any code interpretations available, pl. provide the same.
>

>
regards
>

>
P.Rao.
>

>

>

>

>

>

>

>

>

>

>

>





--
>
To post to this group, send email to materials-welding@googlegroups.com
>
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
>
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
>
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...