Dear Pradeep Kumar,

The loop inspection formats in test pack as follows

1. DAILY FITUP & WELDING INSPECTION REPORTS

2. NDT REPORTS (DP & RT IF ANY)

3. LINE HISTORY SHEET

4. FLANGE GASKET HISTORY SHEET

5. SUPPORT INSTALLATION INSPECTION REPORT

6. MECHANICAL PUNCH LIST

7. NDT PUNCH LIST

8. RF PAD PNEUMATIC TEST REPORT

9. HYDROTEST REPORTS

10. PRESSURE GUAGE CALIBRATION CERTIFICATE

11. LINE SCHEDULE

12. MECHANICAL CLEARANCE INSPECTION REPORTS


Thanks & Best Regards, 

Pavankumar Reddy.



On Wed, Dec 20, 2017 at 9:06 PM, Pradeep kumar hormis <pkhormis@gmail.com> wrote:
Sirs

Could anyone can give me a sample copy of pipeline Hydrotest package index (contents).

Thanks & Regards

PRADEEPKUMAR HORMIS

Mob: +966-58 16 20 710



 
 


 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

Re: [MW:35354] Cast-iron welding

1. Preheat joint area(other area, cover with mineral wool). 2. ENiCi or ENiFe-CI. 3. stringer bead. 4. peening is to be done on weldmetal im...