Many be depends on the Accuracy of PMI Testing Machine.
Normally most specification requires PMI verification only for high Alloy.
Thanks & Regards
J.Gerald Jayakumar
0091-9344954677
On Wednesday, December 6, 2017, 6:27:09 AM GMT+4, zubair <zubair.me@gmail.com> wrote:
Dear all,
-- Please note , I need help when weld P11 material with filler wire ER80S-B2 after check PMI Cr. Content is more then 2 % in weld deposit area , As per Requirement Only need Cr. % is below 2%,
Process(TIG) , Base metal ,heat control , filler wire everything is excellent.
Someone have idea why this problem occurred ??
Thanking you very much in advance
Regards
Zubair
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment