Dear All
what is difference between buttering& build up?because both of them are surfacing activities acc to AWS A.3.0
we have a branch connection in piping that header cut,the hole has a 2in bigger than O.D of branch.
we have a qualified groove wps acc to ASME IX that have a thickness range of 5-30mm.the thickness of header is 25mm.
Now which word must be used in this case?we can build up header with thick of 25mm and width of 45-50mm acc to groove wps?
Regards.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.

No comments:

[MW:34920] Tubesheet Hole step

Hello Team, I have one question any tolerance given for tubesheet Hole step. Please do needful. Regards, AP  -- https://materials-...