Re: [MW:12470] mixed feed convection coils

It looks like this failure is HAZ and this mettalurgical failure is due to increase in material hardness due to welding ; this failure looks like this is happened in service ; normaly these type of defect comes in service when these section subject to pressure. since this failure is on SS 312 - 304H which require to be analyzed ; i will suggest you to measure teh hardness value of this material near to crack area and also to measure one reading at 100mm from

On 16 September 2011 08:42, <snbagchi@aol.in> wrote:
Dear  Mr. Karandish,
 
The crack appears to be over the entire weld, and obviously, the welding process needs to be corrected. I feel that this requires a thourough
investigation at the site and metallurgical evaluation and testing if we need to correct this problem. I am a Metallurgy/ welding consultant ( IIT Kharagpur, Metallurgy, 43 years experience) with experience in welding of S.S., P91 steel, etc. I am willing to take up this problem.
 
S.N.Bagchi.



-----Original Message-----
From: AA karandish <aa.karandish@yahoo.com>
To: material & welding <materials-welding@googlegroups.com>
Sent: Thu, 15 Sep 2011 5:09 pm
Subject: [MW:12461] mixed feed convection coils




Dear experts,
In attached images you will find the failure happened on the junctions of header to heater tubes of a natural gas + steam heater. The heater specification is as follows:
Inside fluid: natural gas + steam
Outside fluid : flue gas from burning of natural gas in the reformer of an Ammonia plant.
Tube and header material : SA-312 TP 3047H
Considering the above let me have your suggestion regarding the failure reasoning.
 
Regards,
Karandish
  
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .