In my opinion- yes, as per UG 99(a)(1), I consider it as major repair, as you are welding almost 20% of thickness.
From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of hrishikm07@gmail.com
Sent: Tuesday, September 27, 2011 3:17 PM
To: Materials Welding
Subject: Re: [MW:12554] defect on circ-seam of H2 service vessel
The defect is visually confirmed; nothing is assumed. I want to conclude that for repair of this dimension does the code call for rehydro?
Regards
Hrishi
Sent on my BlackBerry® from Vodafone
From: "Bathula Raghuram (Mumbai - PIPING)" <R.Bathula@ticb.com>
Sender: materials-welding@googlegroups.com
Date: Tue, 27 Sep 2011 13:01:44 +0530
To: 'materials-welding@googlegroups.com'<materials-welding@googlegroups.com>
ReplyTo: materials-welding@googlegroups.com
Subject: RE: [MW:12551] defect on circ-seam of H2 service vessel
did you compare this image with the RT taken at fab shop? Did you conclude anything why it was happened?
Did you check visually and measured these dimensions or assumption from the RT image? Images like this are possible May be due to the thickness difference of shell and dished end. If it is visually confirmed, yes repair by welding is required followed by local PWHT/NDT/hardness check and re hydro
From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of K.M Hrishikesan
Sent: Tuesday, September 27, 2011 11:44 AM
To: materials-welding
Subject: [MW:12548] defect on circ-seam of H2 service vessel
Dear Mr. Pradeep Goswami & other experts...
We have a newly fabricated Vessel having following details
Vessel: 1200 mm ID X 4550 mm TL-TL
MOC: SA 516 Gr 60
Code of constr: ASME section VIII div 1 2007 edn.
Thickness: shell-20mm; DE-24 mm
Design pr- 32.3 kg/sq.cm; Design temp - 80 deg.C
Service: LPG+Naphtha ; Vessel is designed for Hydrogen service, 100%RT, Fully PWHT; hydrotested ,cleared by TPI, erected at site, yet to be commissioned
Imperfection (a notch or gouge out)of about 3-4 mm deep and 15 mm long observed on weld seam CS-1 (Top Dished end to shell circ. seam joint ) from inside of vessel. Please see the attached image of segment radiographed by us.
My queries...
What rectification shall I do on the defective segment on the service point of view?
What are the NDE's required?
Is a local PWHT mandatory at the repaired segment?
Any special precautions for H2 service...
appreciate your quick feedbacks..
Regards
Hrishi