Dear All,
Regarding heat treatment ,
I have P1 to P8 PQR with following heat treatment,
Loading temperature :- 350 ̊C
heating rate : 70 ̊C /hr
Socking temperature: 620 ̊C
Cooling rate : 70 ̊C/hr
Unloading temperature: 350 ̊C
our job requirement is
Loading temperature :- 350 ̊C
heating rate : 70 ̊C/hr
Socking temperature: 670 ̊C
Cooling rate : 70 ̊C/hr
Unloading temperature: 350 ̊C
Is it possible to use above PQR for same job if yes please tell me the reference in section IX. or this not possible then why because above all temperature below lower critical temperature..
please advice your valuable experience..............
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
No comments:
Post a Comment