RT / MPI before PWHT is internal inspection and RT / MPI after PWHT is
required by ASME B.31.3 para 341.3 Examination requirements,
(a) for P.nos 3,4 and 5 materials Examination shall be performed after 72 hours
completion of any heat treatment.
--
George Xue (Xue Guoliang)
Suzhou CXGL Mechanical Engineering Co., Ltd.
Purchasing and Engineering Manager
Rm 418 No.979, Sanxiang Road, Suzhou, 215004, Jiangsu,China
Tel: +86-512-68639769 Fax: +86-512-68639492
Email: cxueguoliang@gmail.com
Skype: xuegl2001
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
Subscribe to:
Post Comments (Atom)
Re: [MW:35289] Welding consumable for S355J2WP material
S355 J2 WP is a weathering structural steel It has better atmospheric corrosion resistance. Use E 8018 - W1/W2 Electrodes This is regular...
-
Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? ...
-
Definition of buttering from ASME Section IX, QW/QB-492 Definitions: Buttering: the addition of material, by welding, on one or bot...
-
Section I. PRINT READING 3-1. GENERAL a. Drawings . Drawing or sketching is a universal language used to convey all necessary information to...
No comments:
Post a Comment