yes, refer QW403.6
On Jun 21, 1:47 pm, LALIT VADADORIYA <lalit.vadador...@gmail.com>
wrote:
> Dear expert,
>
> If welding procedure is qualified for the SA 516 Gr.60 to same (P No.1
> Group 1 to same), then is it required to conduct another PQR for the SA 516
> Gr.70 to same (P No.1 Group 2 to same), if impact requirement is applicable
> for both material at same temperature?
>
> --
> Regards
>
> *Lalit Vadadoriya
> Sr.Engineer (Inspection)
> Engineers India Limited*
> *Dahej Petrochemical Complex,*
> *Dahej (Gujarat)*
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
Subscribe to:
Post Comments (Atom)
Re: [MW:35289] Welding consumable for S355J2WP material
S355 J2 WP is a weathering structural steel It has better atmospheric corrosion resistance. Use E 8018 - W1/W2 Electrodes This is regular...
-
Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? ...
-
Definition of buttering from ASME Section IX, QW/QB-492 Definitions: Buttering: the addition of material, by welding, on one or bot...
-
Section I. PRINT READING 3-1. GENERAL a. Drawings . Drawing or sketching is a universal language used to convey all necessary information to...