Saturday, September 28, 2013

[MW:18794] Welding 36'' X 24'' Split tee(A 234 Gr WPB) on 16mm thick pipeline(API 5LX-65) carrying gas

Gents,

We are currently faced with a challenge with regards to welding a 50mm thick split tee fitting on a 16mm gas pipeline, Could any one help me with past experience on this with regards to structural integrity of the weld and welding issues encountered.

Best Regards

Philip .T

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm

The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.

No comments:

Re: [MW:35241] Overlay welding defects

Dear Sir, The below is another type of defect,Mostly these two type of defects we faced. Regards, R.Gowtham. On Wed, Sep 11, 2024 at 1:42 PM...