sending here with the drg of the same
preparation done are
rough m/c of the flange face & od
step inside the flange to suit the length of the job the id of the step maintained was such that the pipe was press /tight fit in side the flange
welded by gtaw as per details given in earlier mail
--
Regards
S.B. Badami
RMS Engineering
11/1 Shanti Nagar Bhosari
cell no +919850920429
+912027127939