RE: [MW:7262] Using WPS qualified as per D1.1 to weld pipework as perASME IX

Phillip,

 

If you qualified a PQR to AWS D1.1 you most likely can use the data to write a PQR to ASME Section IX.  You will have to review the data taken during the PQR test and mechanical test results to assure that all the requirements of Sc IX are met.  If your data and test results are sufficient then you may write a new PQR in an acceptable Sc IX format.  With the PQR you will write the WPS with limitations based on the ASME PQR and Sc IX permitted ranges. 

 

Think about it, if the data exists and properly qualifies what you will do in practice, what practical reason would there be to perform another PQR test.  You would simply repeat the same test, with the same basic parameters, process, base metals, weld consumables and, theoretically, have the same results.  The reason to perform the PQR in the first place is to verify that a sound weld with appropriate room temperature mechanical properties can be obtained when welded under certain conditions.

 

 As long as the data and results meet the requirements, it can be applied to any Code.  Thus if I perform a weld under EN rules with observation of a Notified Body Inspector, I can write from that data a PQR and WPS to EN 15614, ASME  Sc IX, and/or AWS if I have made the effort to assure that the data and test results satisfied the qualification requirements for all three.  The WPS ranges of qualification will most likely be different but that doesn’t affect the quality of the input data.

 

{Note the obvious -  that an AWS prequalified welding procedure may not be warped into a Sc IX welding procedure as there is no PQR}

 

John

 

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of Endri Prasetyo
Sent: Tuesday, September 28, 2010 11:20 AM
To: materials-welding@googlegroups.com
Subject: Re: [MW:7257] Using WPS qualified as per D1.1 to weld pipework as perASME IX

 

Dear Philip,

In my opinion cannot. Your procedure is only for D1.1 application.
When we will apply another code, so we have to follow the code we will refer to.

Kind Regards,
Endri

Sent from my BlackBerry®


From: "Philip, Taiye (Lagos)" <Taiye.Philip@deltaafrik.com>

Sender: materials-welding@googlegroups.com

Date: Tue, 28 Sep 2010 13:00:41 +0100

To: <materials-welding@googlegroups.com>

ReplyTo: materials-welding@googlegroups.com

Subject: [MW:7250] Using WPS qualified as per D1.1 to weld pipework as per ASME IX

 

Hello gents,

 I have a WPS qualified as per D1.1 8 inches for welding structural work, in 6G position,

My query is can I use these procedure to weld pipe work as per ASME IX for the same material?

Pls I need further clarification with codes support.

 

Regards

Philip Taiye

 

 


*** WORLEYPARSONS GROUP NOTICE *** "This email is confidential. If you are not the intended recipient, you must not disclose or use the information contained in it. If you have received this email in error, please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the views or opinions of any company in the WorleyParsons Group of Companies."

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...