Pressure testing and NDT testing of the line, both are separate subjects.

 

Pressure testing will validate the system integrity, ie design condition, particularly with respect to design pressure.

 

NDT examination is based on the joint efficiency and process condition requirement.

 

If your line condition, calls for 10% RT, it can’t altered. Regarding the change in pressure test, from pneumatic to hydrostatic, decision can be taken by piping designer, based on the background (severity, service life, etc.) of the line.

 

Regards,

 

JIGNESH R RANA

Chief Engineer

Inspection & Expediting

UHDE INDIA LIMITED

P Please don't print this e-mail unless you really need to


From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of P. PALANIVEL
Sent: 14 December 2009 09:17
To: materials-welding@googlegroups.com; arulvijiya@gmail.com; p.arul@cairnindia.com
Subject: [MW:3826] RT Requirments

 

Dear Friends Good DAY,

 

Can any one help for the below quiery,

 

A requirement for to replace Pnuematic test in palce of Hydro test for Instrument Air line.  Already there is a requirment of 10% Radiography of the line. What will be the RT required % if Pnumetaic test is carried out.

 

Pl. also let us know where may the requirment is given in CODEs or any other Project spec.

 

 

Thanks & Regards,

 

Palanivel.P

Quality Superintendent.

CAIRN INDIA,

Barmer, Rajasthan - 344 001. India.

Mobile   :   +91 90018 94547 & +91 97904 00797.

E Mail    :    p.palanivel@cairnindia.com

                     www.cairnindia.com

 

 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.


Messages sent by email can be manipulated by third parties and are therefore generally not legally binding. This message contains confidential information that may be privileged or protected from disclosure. If you are not the intended recipient, please be advised that you have received this email by mistake. You are requested to notify us immediately by return email and delete this email from your system. Any use, copying, distribution or printing of information by the unintended recipient is strictly prohibited. Thank you.

Regd. Office: Uhde House, Vikhroli (West), Mumbai 400 083, India
Tel: 91-022-6796 8000, Fax: 91-022-2578 4327 Website: www.uhdeindia.com

No comments:

[MW:35346] Cast-iron welding

Any advice for cast iron welding Sent from Yahoo Mail for iPhone