Dear All' I' ve to inspect centrifugal pumps for (chilled water) as per API 610. I m familiar with all the inspection stages,but I want to know more about NPSH test. A) NPSH test to be done at 5 points 1) zero flow 2) min. flow 3) in between min. & rated flow 4) rated flow & 5) max. flow. is it correct? B) What r the parameters to be checked during above mentioned test? C) What is to be checked during performance test? I need detail guideline,pl. help. Thanx & Regds.to all. PSP |