Design only need to be verified, Nothing to do with vessel, However change in temperature is small and only in plus side. Hopefully there will be no R-Stamp.
Thanks & Regards,
Mohd. Azam--Dear All,
I have situation where Air Receiver Vessel made of SS 316 designed as per ASME SEC VIII DIV 1 U stamped shipped to site but not yet installed. The vessel is stored on warehouse in packed condition.
The Present design temperature is 70°C which need to be changed to 85°C.
Can you please suggest which are steps we have to take ? Any code reference for recertification ?
Regards
Praphulla
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/341D89B8-0E22-4517-AE8D-5DD65D81A0F5%40gmail.com.
For more options, visit https://groups.google.com/d/optout.
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CABD%2BRXRHHMQDty7yRzwT%3DUyac6cejjVH5FHHj%3DwaVMEXchd8Ew%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment