Dear All,
I have situation where Air Receiver Vessel made of SS 316 designed as per ASME SEC VIII DIV 1 U stamped shipped to site but not yet installed. The vessel is stored on warehouse in packed condition.
The Present design temperature is 70°C which need to be changed to 85°C.
Can you please suggest which are steps we have to take ? Any code reference for recertification ?
Regards
Praphulla
No comments:
Post a Comment