[MW:23830] tank nozzle connection using sokolet - blanking

Dear Experts ,
Our supplier for Fuel gas filter separator wrongly provided the nozzle for level gauge during fabrication and would like to blank off as per attached procedure. This is ASME stamped vessel and procedure already accepted by their Authorized inspector (AI).This will form part of the MDR and will submitted as final documentation.

For blanking, instead of plate, I would like to ask for a plug as attached. Is it better?
seeking advise ,since we have to submit our plan before client.

K.M. JIJILAL

--
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAHmEnHj2sn4mr7-eyBHcmp%2BTuviA29CvgM%3DPMiPJ28GR%3DRLAgA%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:35346] Cast-iron welding

Any advice for cast iron welding Sent from Yahoo Mail for iPhone