code does not say before or after for sec 8 construction, but it is good engineering practice to MT before and after for P1 materials. As far as B31.1 power piping u have to do NDE after PWHT for materials P3,4,5,15E
-- THANKS & BEST REGARDS,
KG.PANDITHAN, IWE, AWS-CWI, CSWIP 3.1,
CONSULTANT-WELDING & QUALITY
On Mon, Oct 19, 2015 at 7:11 AM, Urdiansyah <urdiansyah@gmail.com> wrote:
--Dear Expert,
Currently I work at fabricator of Pressure vessel and Heat exchanger,
During Renewal ASME, AI question about MT shall be done before or after PWHT ?
Kindly advice for this matter
Thank you for answered,
Best Regards,
Urdiansyah
Engineering PIC
PT.Daekyung Indah Heavy Industry
Cilegon Plant :
Jl. Australia II Kav. K1 Kawasan Industri (KIEC)
Cilegon 42443, Banten - INDONESIA
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/4c4f5ad7-fc11-4d20-a7c3-0ac84044a3b2%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at http://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAJzm4ePni380Yb4ZmvsZkA-O_DAirr8gR3SufoQ_J-bALe3kFQ%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment