[MW:1560] Re: NDT after hydrotest for ASME Sec VIII Div 2 vessels

I do not see benefit of NDT after hydrostatic test. If the result is "fail" for NDT, you will require repair and re hydrostatic test...
 
Regards,
PAN

 
2009/2/8, Raghuram Bathula <raghurambathula@gmail.com>:

Is there any NDT requirement after hydrotest in Section VIII div2 for
any material?

Thanks in adv.

--~--~---------~--~----~------------~-------~--~----~