[MW:27037] Issues during hydro-testing of Internal floating roof tank

Dears,


We have an internal floating roof tank with an aluminum internal floating roof and other MOC of tank being CS. Does anyone of you anticipated any issues if hydro-testing the tanks with water if water will be in the tanks longer than 3 days? Have ever you faced Galvanic Corrosion will be caused by using Aluminum Internal Floating roof and hydro-testing with water for periods of time that exceed 3 days. As our tank will take approximately 9-11 days to hydro-test, hold 24 hours and then drain.

Please share your opinions.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:34920] Tubesheet Hole step

Hello Team, I have one question any tolerance given for tubesheet Hole step. Please do needful. Regards, AP  -- https://materials-...