[MW:14979] Aluminium Bronze weld overlay on P-1 Base metal.

Dear Experts,
 
Good day,
 
In one of our Job, requirement is Aluminium Bronze weld overlay on P-1 Base metal + PWHT. Weld deposit thickness is 3 to 5 mm. I shall have to qualify Welding Procedure in accordance with ASME Sec. IX using TIG manual process.
Which care shall I have to exercise during welding procedure qualificaiton regarding Initial Cleaning, Inter pass cleaning, Preheat temp., Inter pass temp., Post heating and PWHT Cycle (including H.R., Soaking Temp., Time and C.R.)? Further, the iron dilution should be restricted to 2.5% (maximum) in the finished undiluted layer.
 
Please suggest me the correct welding procedure to meet the requirements.
 
Thanks & regards,
 
 
C. R. GANDHI 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...