Hi Members,
 
Kindly request your suggestion on the following matter.
 
We have to weld one 2" Nozzle (PNo.4) to Tube sheet with (PNo.4). Due to some practical dificulties we have to avoid PWHT of this joint. So we are planning to buttering both nozzle and tube sheet nozzle opening with Inconel. Then Butt weld the joint with Inconel.
 
We have one overlay procedure (SMAW) with Inconel on P4 material with PWHT and another butt welding procedure for Inconel to Inconel (GTW+SMAW) without PWHT.
 
Can I use these PQR together for this butt weld?.
 
Or I have to qualify a new buttering+buttwelding PQR with same condition?.

Thanks & Regards
Muhammed Ibrahim PK

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...