Hi.... Professionals,

You are not specify the application of codes such as Process piping, power piping, gas piping and also the SIZE of pipe.
In general (Process plant / Petroleum Refinery) the use of stub-in or stub-on depends on EPC / clients requirements.
You can refer ASME B31.3 _ 2010  - Fig. 304.3.3 and para 304.3.1

Regards,
KRISHNAKUMAR.M.S
Piping Engineer
FEDO, INDIA

----- Forwarded Message -----
From: harsha bhat <harshnb@gmail.com>
To: materials-welding@googlegroups.com
Sent: Thursday, 24 November 2011 8:46 PM
Subject: [MW:13049] PIPE TO PIPE BRANCHING

Dear Experts,


Can anyone please tell me in case of pipe to pipe branching is it stub-in or stub-on, which one would be the preferred choice.

On the out set it seems that stub-in would be preferred if the line is of higher rating. But still will be helpful if anyone would give their opinion on the same.

Thanks in advance,
Regards,
Harsha Bhat.


--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.


No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...