According to AWS D1.1 3.13.4 Fİgure 8 in structural steel projects.CJP
is written in that.Is complete penetration required in back up weld
area?.
For example;PQR specimen is welded but according to UT results , there
are defects only in backup weld area.Is it allowable?.
Is backup weld area partial penetration??
Annex K:
BACK UP WELD(Tubular Structures):The initial closing pass in a CJP
groove weld,made from one side only,which serves as a backing for
subsequent welding,but is not considered as a part of the theoretical
weld(Figures 3.8 through 3.10,Details C and D)
Serdar KOLDAS
Mechanical Engineer B.Sc.
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
To unsubscribe, reply using "remove me" as the subject.
No comments:
Post a Comment