Hi!
You require to qualify for each joint configuration separately
Regards
Hegde P.b
On Tuesday, 29 April 2014 6:27 PM, Materials & Welding <materials-welding@googlegroups.com> wrote:
In fabrication drawing, Tube to tubesheet joint with 4mm projection.
in the Mock-up/PQR, vendor kept 0.5mm projection, but fused the tube with the tubesheet.
Is vendor to provide mock-up with 4mm projection, or change only the WPS to show 4mm projection in the joint, with the same PQR.
-- in the Mock-up/PQR, vendor kept 0.5mm projection, but fused the tube with the tubesheet.
Is vendor to provide mock-up with 4mm projection, or change only the WPS to show 4mm projection in the joint, with the same PQR.
as per QW 288 this is not an essential variable, hence in my opinion revision of WPS is OK.
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment