RE: [MW:16559] Leak Test/Hydro Test/Visual

only visual all line complete according to ISO PLUS visual for all joint
 

Date: Sun, 20 Jan 2013 23:39:00 -0800
From: email2ragkiran@gmail.com
To: materials-welding@googlegroups.com
Subject: [MW:16550] Leak Test/Hydro Test/Visual

Hello!!
Our client line list specifies "Visual" for some UG lines. Does this mean checking the line/joints by filling water to the operating/design pressure or only check the visual condition of the weld joint after welding.

Thanks,
Kiran

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
 
 

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...