Tuesday, January 22, 2013

Re: [MW:16564] Leak Test/Hydro Test/Visual

NO, no hydro test required if specify that only visual test of welding
to be done

On 1/21/13, cbe swamy <cbe_swamym@hotmail.com> wrote:
>
>
> Dear mr.Kiran,
>
>
>
> (1) Examination of parts as fabrication progresses, for material marking,
> that defects are not evident and that dimensional geometries are maintained
> (UG-95 & 96 and UF-30).
>
> (2) Making a visual inspection of the vessel to confirm that there are no
> material or dimensional defects (UG-95, UG-96, and UG-97).
>
> (3) As fabrication progresses, all materials used in the construction shall
> be examined for imperfections that have been uncovered during fabrication as
> well as to determine
> that the work has been done properly.
>
>
> Thank & Best Regards,
>
> M Veera SAMY- Bureau Veritas.
> Coimbatore
>
>
>
>
>
>
>
> From: mahmoudharb100@hotmail.com
> To: materials-welding@googlegroups.com
> Subject: RE: [MW:16559] Leak Test/Hydro Test/Visual
> Date: Mon, 21 Jan 2013 07:55:21 +0000
>
>
>
>
> only visual all line complete according to ISO PLUS visual for all joint
>
>
>
>
>
> Date: Sun, 20 Jan 2013 23:39:00 -0800
> From: email2ragkiran@gmail.com
> To: materials-welding@googlegroups.com
> Subject: [MW:16550] Leak Test/Hydro Test/Visual
>
> Hello!!
> Our client line list specifies "Visual" for some UG lines. Does this mean
> checking the line/joints by filling water to the operating/design pressure
> or only check the visual condition of the weld joint after welding.
>
>
> Thanks,
> Kiran
> --
> To post to this group, send email to materials-welding@googlegroups.com
> To unsubscribe from this group, send email to
> materials-welding+unsubscribe@googlegroups.com
> For more options, visit this group's bolg at
> http://materials-welding.blogspot.com/
> http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
>
> The views expressed/exchnaged in this group are members personel views and
> meant for educational purposes only, Users must take their own decisions
> w.r.t. applicable code/standard/contract documents.
>
>
>
> --
> To post to this group, send email to materials-welding@googlegroups.com
> To unsubscribe from this group, send email to
> materials-welding+unsubscribe@googlegroups.com
> For more options, visit this group's bolg at
> http://materials-welding.blogspot.com/
> http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
>
> The views expressed/exchnaged in this group are members personel views and
> meant for educational purposes only, Users must take their own decisions
> w.r.t. applicable code/standard/contract documents.
>
>
>
>
> --
> To post to this group, send email to materials-welding@googlegroups.com
> To unsubscribe from this group, send email to
> materials-welding+unsubscribe@googlegroups.com
> For more options, visit this group's bolg at
> http://materials-welding.blogspot.com/
> http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
>
> The views expressed/exchnaged in this group are members personel views and
> meant for educational purposes only, Users must take their own decisions
> w.r.t. applicable code/standard/contract documents.
>
>
>

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm

The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...