Re: [MW:16346] minimum length of pipe in the subsea spool..

 Mr. Putra.

Length between two consecutive welds could be any thing beyond 300 mm and above. Code does  not specify it.  Normally
the distance is kept is 1 to 2 meters.
 
Sridhar.



From: chandra putra <bocant_btm@yahoo.com>
To: materials-welding <materials-welding@googlegroups.com>
Sent: Wednesday, 26 December 2012 1:07 PM
Subject: [MW:16330] minimum length of pipe in the subsea spool..

deat expert,

i want to ask about,how length minimum of the pipe if any additional joint in the subsea pipe/pipeline.
i try to search in the ASME B31.8 and other spec about pipeline, i dont find minimum length of pipe/distance between weld to weld.
can somebody advise for me,where the spec will be use?!
Thanks for your time and attention.
 
Regards,
Chandra Putra

Skype: chandra.putra12
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
 
 


No comments:

[MW:34919] Welder qualification certificate

Dear All     anyone can share a format for welder certificate and card format        Thanks & Best Regards Saleem manhappulath Mob:+9665...