Re: [MW:29011] Tube to Tubesheet Mock up Test

required when your project specification asks  for...

On Wed, 30 Jan 2019 at 15:02, chiluka venkatramulu <ramuluchiluka@gmail.com> wrote:
Dear All,
Pl clarify, when the Tube to Tubesheet Mock up Test is required. Is it required when specific material combinations are there? or  for all Tube to Tubesheet welds? Give code reference pl.

Regards,
Venkatramulu


--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...