Skip to main content

Re: [MW:29020] Interpretation available (IX-04-03)

Dear Friend,
Purpose of post heat is to DIFFUSE hydrogen after welding , for this purpose we hold our joint at 93-80 degree for 1 hour after completion of welding. 

PWHT always Performed below Lower Transformation Temperature, PWHT and Post Heat is different things.

Kind Regards 


On Tue, Jan 29, 2019 at 2:27 PM George Dilintas <dilintas@gmail.com> wrote:
Most propably your client wants you to perform a hydrogen bake-out treatment 

Στις Δευ, 7 Ιαν 2019, 08:58 ο χρήστης muneebslsa@gmail.com <muneebslsa@gmail.com> έγραψε:
Hi All,
Client specification calls for post weld baking/heating (not stated as PWHT) of a P No.1 material after welding for a specific reason. Does it consider a PWHT condition as per ASME Sec IX QW-407.1(a) Point#2, i.e PWHT below lower transformation temperature? If it is considered as PWHT as per the clause above, then would a PQR with 200 Deg C PWHT qualifies to perform PWHT on the weld at 600 Deg C which is below the lower transformation temperature of P No.1 keeping all other essential variables same. Note: Though there is an interpretation available (IX-04-03), it doesn't state the answer instead it refers to QW-407.1 (throwing the ball away wisely).

Originally posted in Linkedin

by



Regards,
Mohamed Muneeb Mahaboob
CSWIP 3.2-89247/2 
IRCA-9001:2015 LA
ASNT-NDT-L2-RTFI-RT-UT-MT-PT.
SAP#:70021650 APs:JAPID, QCS & QCI.
E muneebslsa@gmail.com M +91-636-955-7189
''If you know any art by any means then SCULPT IT - no matter how cheap or useless it is - JUST SCULPT IT, you will never know when experts will be on demand'' 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.


--
Respected Sir,

Please find the enclosed file.

Bilal Arshad Wahla
P.W.H.T Engineer
SEPCO Electric Power Construction Corporation

Saudi Aramco JAZAN IGCC Power Block Project (EPC-4)

Jazan Economic City, KSA 

Mobile: +966 591317207

Email: bilalwahla.047@gmail.com

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .