Hi Friend
PWHT of D/End after forming depends upon various factor and accordingly to be decided
i) Fiber elongation occurred during forming (Generally above 5% needs PWHT)
ii)Service condition i.e. Sour service required PWHT
iii) Clients spec Some of the spec allows SR and some insists for Normalising
Accordingly you have to decide
Regards
Hegde
On Monday, 2 October 2017 1:44 PM, udaya bhaskar <dusroni@gmail.com> wrote:
you can proceed for all thk , except 6mm. as per ASME SR is mandatory for BQ MOC.
On Tue, Sep 26, 2017 at 7:33 PM, Pankaj Kolhe <pankaj.kolhe15@gmail.com> wrote:
--so my question is shall i do SR for all thickness dish end or how to proceed.we have 6mm,10mm,12mm,16mm & 20 mm thk dish end in our job.Dear Experts,AS per IL spec.all cold formed heads need to be stress relieved.MOC 516-70pankaj
https://materials-welding. blogspot.com/
https://www.linkedin.com/ groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@ googlegroups.com.
Visit this group at https://groups.google.com/ group/materials-welding.
For more options, visit https://groups.google.com/d/ optout.
With Regards
Udyabahaskar.D
+919951728551
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment