Skip to main content

Re: [MW:22306] PED 97/23/EC WPS & NDT Requirements

BEGIN:VCARD
X-LOTUS-CHARSET:UTF-8
VERSION:3.0
PRODID:-//Lotus Development Corporation//NONSGML Notes 8.5.2//EN_C
FN:George H Dilintas/GRC/VERITAS
N:Dilintas;George;;;
ADR;TYPE=WORK;TYPE=PREF:PIRAEUS;;23\, Etolikoy Str.;PIRAEUS;;185 45
;GREECE
ADR;TYPE=HOME;TYPE=PREF:;;19-21 B. Laskou str.;Athens;Attika;11 633
;Greece
TEL;TYPE=HOME:+30-1-7667 197
TEL;TYPE=WORK:+30-210-40 63 113
TEL;TYPE=HOME;TYPE=FAX:+30 - 1 - 7667 197
TEL;TYPE=WORK;TYPE=FAX:+30-210-40 63 118
TEL;TYPE=CELL:+30 -69 44-64 62 04
EMAIL;TYPE=WORK;TYPE=PREF;TYPE=INTERNET
:george.dilintas@gr.bureauveritas.com
ORG:Bureau Veritas;Industry
REV:20131201T024559Z
END:VCARD

SEE MY COMMENTS IN BOLD

PQR's should be witnessed ( no formal requirement for witnessing)/approved   by RTPO/ NOBO even if it is as per ASME IX and Section VII Div. 1 . ( ASME does not require third party witness ). This applies for Categories II, III, IV

Welders to be certified (approved, the term certified is not mentioned in the PED)  by RTPO/NOBO. If welders have been qualified as per ASME but witnessed by a RTPO/NOBO it will satisfy.( ASME does not require third party witness ).  This applies for Categories II, III, IV

NDT personnel to be certified (approved, the term certified is not mentioned in the PED) by RTPO typically  by BINDT etc which is a member of European Federation for Non-Destructive Testing (EFNDT). ( ASNT does not require third party witness ), This applies for Categories III, IV


NOBO and RTPO are bodies registered  (Notified to the EU  is the correct term, legally notifcation is different from registration) in the European union. You can get the list of approved national bodies from this link 

PED is a law and when you implement a law the correct terms have to be used.

    best regards

    Dr. Georgios Dilintas

    Authorized Nuclear Inspector
    Authorized Inspector Supervisor


    I&F REGIONAL TECHNICAL MANAGER
    BUREAU VERITAS HELLAS

    Tel: +30 210 40 63 113/4
    Fax: +30 210 40 63 118
    Cell: +30 69 44 64 62 04
    (See attached file: Dilintas_George.vcf)

Nasser Kunju ---19/11/2014 17:25:21---PED is a directive only it is not  design code.  Since you are going for ASME for the design and con

From: Nasser Kunju <nasser.kunju@gmail.com>
To: materials-welding@googlegroups.com, saravanshyla@gmail.com
Date: 19/11/2014 17:25
Subject: Re: [MW:22294] PED 97/23/EC WPS & NDT Requirements
Sent by: materials-welding@googlegroups.com





PED is a directive only it is not  design code. 
Since you are going for ASME for the design and construction you need to comply with all  ASME requirements plus additional requirements of PED.

PQR's should be witnessed/approved   by RTPO/ NOBO even if it is as per ASME IX and Section VII Div. 1 . ( ASME does not require third party witness )

Welders to be certified by RTPO/NOBO. If welders have been qualified as per ASME but witnessed by a RTPO/NOBO it will satisfy.( ASME does not require third party witness )

NDT personnel to be certified by RTPO typically  by BINDT etc which is a member of European Federation for Non-Destructive Testing (EFNDT). ( ASNT does not require third party witness )


NOBO and RTPO are bodies registered in the European union. You can get the list of approved national bodies from this link 
http://ec.europa.eu/enterprise/newapproach/nando/index.cfm?fuseaction=notifiedbody.main

Trust the above will help you.



Best regards,
Nasser M.K.

On Sat, Nov 15, 2014 at 4:17 PM, <george.dilintas@gr.bureauveritas.com> wrote:

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at
http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm

The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
materials-welding+unsubscribe@googlegroups.com.
For more options, visit
https://groups.google.com/d/optout.

This message contains confidential information. To know more, please click on the following link: http://disclaimer.bureauveritas.com

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .