Hera are some recommendations to qualify PQR for In service welding of split Tee.

 

·         The requirement for production welding in section 5/7 should be applied to in-service welding except for the additional requirement given in the appendix-B.

·         For circumferential fillet weld Dia, thickness and base metal are not the essential variables as per Appendix B, Para B.2.2.1.1 and 2.2.1.3.(additional requirements) but not for longitudinal groove weld.

·         For in service welding PQR needs to be qualified as per fig B-2.

·         Mechanical test should be as per  Table B-1.

·         C.E and pipe operating conditions shall be mentioned in the procedure.

 

 

Regards

 

Faisal Shahzad Meer

 

TEL :+966 3 6795805-7 Ext. 124|www.gccksa.com

E-mail  fmeer@gccksa.com 

+966 - 553919249

 

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of anas k
Sent: Saturday, November 29, 2014 5:25 PM
To: materials-welding@googlegroups.com
Subject: [MW:22419] WPS - In service welding

 

Dear Experts,

 

I am in a situation to establish WPS for in service piping as per 1104 Annex B. The WPS is for a split tee tie in joint (Encirclement Tee)

Split tee ASTM A 516 Grade B

Header pipe 24" sch 60 (API 5L Grade B)

 

How to select the thickness range ?

How to select dia range ?

What are the essential variables ?

 

Please guide me to make a preliminary WPS.

 

Thanks & Regards

Anas Karanath

 

 

 

 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...