[MW:31719] Re: Required pWPS FOR p10H G1 to P1 G1 also P1 G1 to P1 G1

Follow specification and refer to ASME IX QW-250. Filling pWPS as guideline here. or you refer to qualified WPS and make it again.

On Tuesday, October 27, 2020 at 9:53:14 AM UTC+7, Fatir Asrar wrote:
Please kindly support me to prepare a pWPS for welding Duplex Stainless Steel to Carbon Steel.
Standard: ASME Sec IX & 31.3
Base Metal: P10H G1 to P1 G1
Thickness: 1.5mm and Above
Dia.: 1" and Above
Process: GTAW
Service: SEA WATER

Kindly upload samples if available. 
Also please let me know the Destructive & NDT tests required for Qualification to obtain supporting PQR.

Also, I need a sample of WPS/PQR for:
Standard: Sex IX & 31.3
Base Metal: P1 G1 to P2 G2
Thickness: 1.5mm & above
Dia.: 1" & above
Process: SMAW

Please kindly do the needful.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/46d1562c-a90d-41df-b00d-812e9c1c4260o%40googlegroups.com.

No comments:

[MW:34920] Tubesheet Hole step

Hello Team, I have one question any tolerance given for tubesheet Hole step. Please do needful. Regards, AP  -- https://materials-...