[MW:35212] Re: CAN A WELDER QUALIFIED TO ASME IX ALLOWED TO WELD STRUCTURES USING AWS D1.1 PREQUALIFIED WPS

Dear Mr. Aneesh,

According to AWS D1.1 2020 - Part 5.1  Welders, welding operators and tack welders that use prequalified WPSs shall be qualified in conformance with Clause 6, Part C or Clause 10, Part D for tubulars.

For Aramco 12-SAMSS-007 section 7.5  Welding procedures and individual welders shall be qualified in accordance with the requirements of AWS D1.1/D1.1M, AWS D1.3, AWS D1.8/D1.8M or AWS D14.1/ D14.1M as appropriate.

If the structural items construction code is AWS D1.1 - Both WPS and Welder Qualification should be as per AWS D1.1 only.

On Saturday, July 13, 2024 at 2:33:54 PM UTC+3 Aneesh K wrote:
Dear Experts

Please advise if a welder qualified in 6G position to ASME Sec IX , is allowed to Weld structures using WPS which is prequalified to AWS D.1.1

Or is it mandatory to perform separate welder qualification using AWS D.1.1 WPS to weld structures 

This is for Saudi Aramco Project

KINDLY ADVICE.

Thanks 


Aneesh

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/f690dfa4-5cb1-4658-aa74-7492c0491d91n%40googlegroups.com.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...