On Mon, Apr 19, 2021 at 11:39 AM Vishwas Keskar Welding Manager WELDING <vvkeskar123@gmail.com> wrote:
Is  that WPS  addressing - 
 QW 402  - Joint design - GTAW - Backing - With/Without 
(Ref - QW256- GTAW - QW 402.5- Addition of  backing is Non essential variable.)

if Both (Backing - With/Without  )  is addressed( which  like  normally is  addressed), then there is no issue at  all .

Eg-

QW 402-

Backing: With/Without                                                                         

Root spacing: As per piping fabrication drawing                                                                                                          

Backing Material (Type): Yes (Metal)

1. Metal -        2. Non-fusing Metal      

3.   Nonmetallic NA   4. Others 

The matter is to  be resolved  amicably . Meet QAC  In charge along with Welding Engineer, Manufacturing Responsible. Explain him the details . 
It shall be acceptable.


Regards

On Monday, April 19, 2021 at 7:20:46 AM UTC+4 sankar krishnan wrote:
Dear Gentlemen,

   Good Evening, In our project Vessel joint thickness 10mm ,Process(GTAW+SAW),Single V joint 
They completed Welding ,Few days later during Inspection we observed , They have done Internal Welding of the shell, As per WPS its not shown 

Guys let me Know  its can Accepted or Rejected 

If Rejected , Please send Reference code standards

As per QW 402.5 Joints (Backing its non Essential ),Its mention Backing strip or also back welding 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/960d2caa-6684-4216-b79d-6eb48095898cn%40googlegroups.com.


--
shankar

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAAyDEeZbzf%3D%3DHoEnCP4nzL38M9%3DYMKq3OBgcsXkzeT4PfTEhcA%40mail.gmail.com.

No comments:

[MW:34920] Tubesheet Hole step

Hello Team, I have one question any tolerance given for tubesheet Hole step. Please do needful. Regards, AP  -- https://materials-...