hai,
it is possible to take RT of this joint check with RT technician.
Regards,
MLS
On Monday, 25 June 2018 17:53:21 IST, Muhammed Ibrahim PK <ibratech@gmail.com> wrote:
Dear Experts,
-- I would like to get info on following scenario.
Design code : ASME Sec : VIII Div. I
RT requirement : RT1
Service : Not Sour / lethal / cyclic etc (Sulfur recovery Incinerator package).
The vessel having set in type nozzle with full penetration groove. This nozzle to shell weld cannot be radio graphed (Not lip type). Is it required to do UT of nozzle to shell weld (Category D) joints for this vessel if RT is not possible ?.
Please see attached joint configuration.
Thanks & Regards
Muhammed Ibrahim PK
Muhammed Ibrahim PK
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment