Does NACE MR0175/ISO 15156 require production casing to be sour service compliant?


Oil & Gas Corrosion can help you select materials for tubing, casing and downhole components. We understand oilfield metallurgy and the role it plays in well integrity.

Question: Does NACE MR0175/ISO 15156 require production casing to be sour service compliant if the containment string of tubing is a sour service grade and the bottom hole temperature (below the packer) satisfies the casing material operating temperature? For example–a sour gas well with a H2S partial pressure of 0.10 psi (0.007 bar), P-110 casing, L-80 tubing, and a bottom hole temperature of 300 F (150 C). Supporting Information: Related information can be found in NACE MR0175/ISO 15156-2, Table 1, page 2. Production casing is not excluded from meeting the requirements of ISO 15156. AND ISO 15156-1/NACE MR0175, Section 6, which is reproduced in part below with the relevant parts underlined. 6. Evaluation and definition of service conditions to enable material selection 6.1 Before selecting or qualifying materials using other parts of NACE MR0175/ISO 15156, the user of the equipment shall define, evaluate and document the service conditions to which materials may be exposed for each application. The defined conditions shall include both intended exposures and unintended exposures which may result from the failure of primary containment or protection methods. Particular attention shall be paid to the quantification of those factors known to affect the susceptibility of materials to cracking caused by H2S.
Answer:
1) As stated in your inquiry the secondary barrier must also be sour service and follow the requirements of NACE MR0175/ISO 15156.
2) A casing grade can be used under severity 3 of the diagram Fig. 1 of § 7.2.1.2. provided its working temperature is always above the minimum temperature given in ISO 15156-2 Table A.3. This can only be true if the material is well defined (API grade) and its temperature is always above the minimum temperature. According to Table A.3 if P110 is at a temperature ≥80°C 175°F) it can be used in Region 3 of the diagram Figure 1 of §7.2 in ISO 15156-2. It is up to the equipment user to establish that all intended and unintended exposure conditions are covered.
This question is in relation to NACE MR0175/ISO 15156-2 Clause 7.2.1.2
Reference: ISO 15156 Maintenance Panel Inquiry #2010-12


Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...