Does NACE MR0175 require PWHT of overlay weld inconel 625?


Question:We have weld overlays (Inconel 625 filler metal with SAW process) applied to low-alloy ferritic steel valves (ASME/ASTM A 352 Gr LCC). The steel valve is used on wet gas wellhead production platform with operating temperatures at 93°C, operating pressure of 145 bar with vapor fraction of H2S (177 kg-mol/h) and CO2 (877 kg-mol/h). Hardness tests were performed on the as-welded condition. The results achieved were well below the 250 HV criteria of Table A.1 of NACE MR0175/ISO 15156-2. Since the hardness results complied with the requirements of Table A.1 of NACE MR0175/ISO 15156-2, we believe and understand that the valve does not require postweld heat treatment after the weld overlay. Having met the hardness criteria after overlay we believe that we met the requirements of the following paragraphs of NACE MR0175/ISO 15156-2: -Paragraph A.2.1.5 and -Paragraph A.2.1.4 Question: Is our interpretation of Paragraphs A.2.1.5 and A.2.1.4 of NACE MR0175/ISO 15156-2 correct based on the above-stated specific application and conditions and that the valves overlayed with Inconel 625 consumables do not require postweld heat treatment?
Answer:
Paragraph A.2.1.4 states (in the third sentence):
“As welded carbon steels, carbon manganese steels, and low-alloy steels that comply with the hardness requirements of Table A.1 do not require postweld heat treatment.” Paragraph A.2.1.5 states: “Overlays applied by thermal processes such as welding . . . are acceptable if they comply with one of the following: (a) The heat-treated condition of the substrate is unchanged, i.e., it does not exceed the lower critical temperature during application of the overlay. (b) The maximum hardness and final heat-treated condition of the base metal substrate comply with A.2.1.2 and, in the case of welded overlays, A.2.1.4.
Therefore, your interpretation is correct. Provided your weld procedure qualification complies with the hardness requirements in A.2.1.4 and A.2.1.5, no postweld heat treatment is required.
This question is in relation to NACE MR0175/ISO 15156-2 Annex A.2.1.4 and A.2.1.5
Reference: ISO 15156 Maintenance Panel Inquiry #2004-11
UPDATE 2018-06-04: A recent Technical Circular brings relevant updates on NACE MR0175 and 625 weld overlays: https://oilandgascorrosion.com/nace-mr0175-iso-15156-technical-circulars-for-part-2-and-3-published-2018-06-01/





Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...